Release date:2021-04-20
Recently, after investigating and analyzing hundreds of domestic smart factory non-standard automation system integrators, e-works officially released the "2020 China Top 100 Smart Factory Non-standard Automation Integrators List" on the basis of collecting many typical industry cases.
Suzhou Secote Electronics Co., Ltd. is ranked 26th!
TIPS:
1. Smart factory non-standard automation integrators refer to specific industries, mainly to deliver non-standard automation production lines, and combined with the application of industrial robots and other automation and intelligent equipment, can provide turnkey projects for smart factory construction projectsOr an automation solution provider for EPC turnkey services;2. If the non-standard automation system integration business of a listed company has a single subsidiary as the main business entity, only its subsidiaries will be counted; if the listed company and its multiple subsidiaries are involved in the non-standard automation system integration business and consolidated statements, onlyStatistics of listed companies;
From the perspective of regional distribution, China’s top 100 smart factory non-standard automation integration manufacturers are mainly distributed in 17 provinces (autonomous regions, municipalities), of which Jiangsu, Guangdong, Zhejiang and Shanghai are the most concentrated areas, with 27 integrators respectively, 26, 11, and 8, accounting for 72% of the total.In northern cities such as Beijing and Shanxi (Dongjie Intelligent), only one integrator was shortlisted.
After the 2020 epidemic, various industries have accelerated their investment in smart equipment upgrades. The wave of smart factory construction has come, that is, the spring of integrated companies has arrived.An intelligent chemical factory is like an elephant. It is ultimately composed of elephant legs, eyes, brain and other organs. A good integrator can complete the entire elephant through local tissues and organs. This is like the construction of a factory in the future.On the other hand, under unified scheduling, the elephants are allowed to operate in the best posture, instead of the legs, eyes, and brain being closed and operating separately, they seem to be able to walk, but they can’t get fast, and sometimes stop and strike.In the implementation of an integrated project, the success or failure is comprehensively considered, and all links are important, such as the overall plan planning, the company's software and hardware matching degree, on-site construction, and subsequent upgrades and transformations.
How to judge a good integrator?
In terms of overall plan planning: integrating a large number of successful projects with a company, training troops in actual combat, ranging from more than 20 years, to more than thousands of projects to temper, practice is the only test standard.
The company’s software and hardware supporting levels: First, the hardware, the factory has a large enough scale, a large number of related equipment and personnel investment, long-term excellence in the industry, and the quality of the output equipment is guaranteed. A light asset supplier with only office buildings, that is I’m talking about PPT only; the second is software. For the entire future trend of intelligent development, software is like a brain, which defines everything. There is only a strong torso, and elephants will not walk in the right direction. Scale and R&D strength are also a key criterion for suppliers.
On-site construction: The excellent team in the engineering construction company is the guarantee of the quality of the installation, but in order to save costs, the construction team of many manufacturers outsources the whole or part of the project. This is extremely undesirable, uncontrollable, and uncontrollable personnel quality It will cause great hidden dangers, and teams with deep construction experience in smart factories should be the first choice.
Follow-up upgrade and transformation: This is often less considered. For example, the elephant needs to speed up again, and then re-knead its separate legs, eyes, and brain suppliers. Is there any way? not easy.
Give professional things to a professional team to do the best!
Source: Digital Enterprise Network